Road Construction Projects Update

Current Road Construction Projects

Road Construction Projects Update

Current Road Construction Projects

ROAD CONSTRUCTION UPDATE:

Starting notice posted November 24, 2025: Mill & Fill Project

PHASE II - PAVEMENT REPLACEMENT EXHIBITS:

MOST CURRENT

- MARCH 2026

Grapevine Inter top lift night work, pave 3/9 starting 3am
Grapevine to Thistle Top lift outside lanes (500) Pave 3/9 after intersection
Fire station to Sand Hill inside lanes bottom lift (960) Mill 3/9, Pave 3/10
SandHill to OldMill inside lanes (927) Mill 3/10, Pave 3/11
1) Thistle to Arrowhead inside Mill 3/16 Pave 3/17  - 2) Thistle to Arrowhead outside Mill 3/18 Pave 3/19
Fire station to Sandhill outside lane Mill 3/17 Pave 3/18
Start paving Top lift inside lanes after Grapevine

OLD MAPS BELOW:

- Jan 2026

These exhibits show the pavement operations from February 2nd to February 16th. This shows the work zone from Riverside Road to Grapevine.

Contact:

10 E Mesquite Blvd

Mesquite, NV 89027

Monday: 8:00 am–5:00 pm

Tuesday: 8:00 am–5:00 pm

Wednesday: 8:00 am–5:00 pm

Thursday: 8:00 am–5:00 pm

Friday, Saturday & Sunday: Closed

ROAD CONSTRUCTION UPDATE:

Starting notice posted November 24, 2025: Mill & Fill Project

PHASE II - PAVEMENT REPLACEMENT EXHIBITS:

MOST CURRENT

- MARCH 2026

Grapevine Inter top lift night work, pave 3/9 starting 3am
Grapevine to Thistle Top lift outside lanes (500) Pave 3/9 after intersection
Fire station to Sand Hill inside lanes bottom lift (960) Mill 3/9, Pave 3/10
SandHill to OldMill inside lanes (927) Mill 3/10, Pave 3/11
1) Thistle to Arrowhead inside Mill 3/16 Pave 3/17  - 2) Thistle to Arrowhead outside Mill 3/18 Pave 3/19
Fire station to Sandhill outside lane Mill 3/17 Pave 3/18
Start paving Top lift inside lanes after Grapevine

OLD MAPS BELOW:

- Jan 2026

These exhibits show the pavement operations from February 2nd to February 16th. This shows the work zone from Riverside Road to Grapevine.

Road Closure - Horizon Blvd Road starting Dec 18, 2025 to Jan 31, 2026

A portion of Horizon Boulevard, from Canyon Crest Boulevard to Hardy Way, will be closed from Thursday, December 18, 2025, through January 31, 2026.

This closure is necessary for widening the existing roadway as part of the Horizon Boulevard and Canyon Crest Boulevard Roadway Project. Please follow the posted detour routes.

Road Closure - Wittwer Trail Road closed until first part of February.

Starting December 4, 2025 Wittwer Trail will be closed for approximately 60 days due to a 24" water mainline break.

No items found.

Instructions

If you would like to report a problem you have found in Mesquite please select a category that most relates the issue you have found.